Point Murat Pier - Structural Survey & Specifications

Point Murat Pier - Structural Survey & Specifications
Structural Engineering

Comprehensive structural survey producing tender documents for Department of Defence pier upgrade including repairs and fender system design.

Location:

Exmouth, WA

Client:

Department of Defence

A structural survey of the pier was conducted to provide tender documents for the Department of Defence, comprising a scope of work and specifications for the required upgrade and repairs of the pier. As part of the structural repairs, the document also covered the design for the required pier head fender system upgrade.


Continue Reading

Similar Projects

About BG&E – Part of SYSTRA

Visit bgeeng.com

Engineers for Australia's Resources Sector