Newcastle Coal Export Terminal Berths 8 & 9

Newcastle Coal Export Terminal Berths 8 & 9
Structural Engineering Construction Engineering

Temporary jetty structure design facilitating progressive construction of new coal export wharf using modulated steel frame with precast concrete deck.

Location:

Newcastle, NSW

Client:

Laing O'Rourke

BG&E undertook the design of a temporary jetty structure to facilitate the construction of a new coal export wharf at Newcastle, New South Wales. The structure was a modulated steel frame with a precast concrete deck to enable progressive movement of the jetty upstream as the new wharf was constructed.


Continue Reading

Similar Projects

About BG&E – Part of SYSTRA

Visit bgeeng.com