Mining Area C Railway Bridges

Mining Area C Railway Bridges
Bridge Design Structural Engineering Rail Engineering

Concept design and independent verification for four major rail bridges including comprehensive engineering review for cost-effective, disruption-free operation.

Location:

Pilbara, WA

Client:

BHP Billiton

BG&E provided concept design, review and independent engineering verification for 4 bridges on the BHP Billiton Mining Area C to Yandi Railway project.

The concept design engineering review report specifically looked at the design and construction aspects of the Yandicoogina Bridge and other bridge structures on the Mining Area C rail work. The recommendations made for a sound and cost-effective engineering solution to ensure the operation of the railway would be without disruption.

Continue Reading

Similar Projects

About BG&E – Part of SYSTRA

Visit bgeeng.com

Engineers for Australia's Resources Sector